(Integrated Island Resort with Beach, Swimming Pool Complex, and Dining Facilities)

Total Daily Water Consumption: 120–220 m³/day
Two 40-ft containerized SWRO seawater desalination units operate in parallel, with a combined production capacity of 130 m³/day (5.4 m³/h). The system features a modular skid-mounted design, allowing individual units to be started, stopped, or serviced independently while maintaining continuous water supply.
Main Pre-Filter: 15 m³/h, DN65 high-flow stainless steel pre-filter
Multimedia Pretreatment: 12 m³/h
Central Water Purification: 8 m³/h, dual-tank parallel configuration
Central Water Softening: 8 m³/h, three-tank intelligent parallel system for 24-hour continuous softened water supply
Centralized purified water station: 2 m³/h
Purified drinking water is distributed throughout the resort via a centralized water supply network, providing convenient access to treated drinking water for guest rooms and other designated areas.
(Value-added configurations and key selling points for overseas resort projects)
1. Customized Corrosion Protection
The entire system piping can be upgraded to 316 stainless steel, designed for high-salt-spray and high-humidity island environments to improve corrosion resistance and support long-term equipment operation.
2. Smart Control and Remote Monitoring
The complete system is equipped with a PLC + HMI control system, with optional remote Wi-Fi monitoring. Overseas hotel operators can remotely monitor equipment operating status and perform routine system management.
3. Off-Grid Solar-Powered Version
The desalination system can be integrated with a solar photovoltaic power supply package, making it suitable for remote islands and off-grid resort projects without reliable municipal electricity.
4. Water Reuse
Simple reclaimed-water filtration can be configured for suitable sources such as swimming pool water and shower wastewater. Treated reclaimed water can be reused for landscape irrigation and garden watering, helping reduce overall freshwater consumption.
Large-scale coastal resort estate | 100–260 guest rooms (Integrated island resort with beach, pool complex, and dining cluster)
At Qingdao Yanhui Environmental Protection Technology Co., Ltd., we understand that water supply is one of the most important parts of running a large coastal resort. Guests may enjoy the beach, swimming pools, restaurants, and beautiful island views, but behind every successful resort operation is a stable and reliable water treatment system.
For large-scale coastal resort estates with 100–260 guest rooms, including integrated island resorts with beaches, pool complexes, restaurants, and leisure facilities, we provide customized Seawater Desalination Equipment designed around real project needs. Our solution combines seawater desalination, pretreatment, central purification, soft water supply, and drinking water treatment into one complete water management system.
Our Large-scale coastal resort estate water treatment system is designed for resorts that require a continuous freshwater source in locations where traditional municipal water supply is limited, expensive, or unavailable. By using advanced seawater reverse osmosis (SWRO) technology, we help coastal hotels and island resorts transform seawater into safe and stable freshwater for daily operations.
The system is especially suitable for remote islands, tropical resort areas, coastal tourism projects, and offshore locations where reliable water infrastructure is difficult to build. containerized SWRO systems are widely used in these environments because they combine compact design, fast installation, and flexible capacity expansion. :contentReference[oaicite:0]{index=0}
A large coastal resort is different from a normal building. Water is needed everywhere: guest rooms, bathrooms, kitchens, swimming pools, laundry facilities, landscaping, restaurants, and recreational areas. During peak tourism seasons, water demand can increase significantly, making a dependable water source essential.
Based on our engineering experience, we design this solution for resorts with a daily water demand of approximately 120–220 m³/day. The complete system can be adjusted according to local seawater conditions, guest capacity, climate, and operation requirements.
| Project Category | Typical Capacity | Main Water Applications |
|---|---|---|
| Large coastal resort estate | 100–260 guest rooms | Guest rooms, restaurants, pools, laundry, landscaping |
| Daily freshwater requirement | 120–220 m³/day | Continuous hotel operation and public facilities |
| Recommended desalination solution | Containerized SWRO system | Island and coastal freshwater production |
Source: Engineering design reference based on Qingdao Yanhui Environmental Protection Technology Co., Ltd. project planning experience and general resort water demand calculations.

For this type of large island resort project, we normally provide a complete water treatment package instead of a single machine. Our goal is to create a stable water supply chain from seawater intake to final user points.
The core of this solution is a dual 40-foot containerized SWRO seawater desalination system. Two units operate in parallel with a combined freshwater production capacity of approximately 130 m³/day (5.4 m³/h).
The modular containerized design allows each unit to operate independently. When one unit requires inspection or maintenance, the other unit can continue running, helping maintain uninterrupted water supply for the resort.
Compared with traditional on-site constructed water plants, Containerized Seawater Desalination Systems reduce installation complexity because major components can be assembled and tested before delivery. This approach is commonly selected for islands, offshore facilities, and remote coastal projects. :contentReference[oaicite:1]{index=1}
Before seawater enters the RO membrane system, proper pretreatment is required. Our design includes multiple filtration stages to reduce suspended solids, protect membranes, and improve long-term operation stability.
Main pre-filter: 15 m³/h DN65 high-flow stainless steel filtration system
Multimedia pretreatment: 12 T/H
Central purification system: 8 T/H dual-tank parallel operation
Central soft water system: 8 T/H intelligent three-tank parallel configuration
This configuration provides continuous softened and purified water for hotel bathrooms, kitchens, cleaning systems, and other daily applications.
For high-end island resorts, drinking water quality directly affects guest experience. We provide a centralized purified water station with a capacity of 2 T/H.
Instead of depending on bottled water supply, the resort can distribute purified drinking water through internal pipelines to guest rooms and public areas. This reduces logistics pressure and provides a cleaner, more convenient water solution.
The working principle of our seawater desalination equipment is based on seawater reverse osmosis technology. The process is simple but highly effective.
First, seawater enters the pretreatment system, where filters remove larger particles, suspended solids, and impurities. After filtration, the seawater passes through high-pressure pumps and enters the RO membrane system.
The RO membrane separates dissolved salts and unwanted substances from seawater. Freshwater molecules pass through the membrane, while concentrated seawater is discharged through a controlled process.
| Process Stage | Main Function | Benefit |
|---|---|---|
| Seawater intake | Collect seawater source | Provides continuous raw water supply |
| Pretreatment | Remove suspended particles and protect membranes | Improves system reliability |
| SWRO membrane filtration | Separate salt and impurities | Produces freshwater |
| Post-treatment | Adjust water quality | Suitable for hotel applications |
Source: General seawater reverse osmosis process reference and Qingdao Yanhui Environmental Protection Technology Co., Ltd. engineering design practice.
From our experience working with water treatment projects, we know that every coastal location has different challenges. Some islands have high salt content, some have limited power supply, and some require equipment that can operate with minimal maintenance.
That is why we do not provide a fixed package for every customer. We study the local seawater quality, required production capacity, installation environment, and future expansion plans before designing the system.
Our customized approach helps customers receive a water treatment solution that matches their actual operating conditions rather than a standard product that may not fit the project.
One thing we pay close attention to when designing seawater desalination equipment for island resorts is the working environment. Coastal areas often have high humidity, strong salt spray, and long periods of equipment operation. Ordinary materials and poorly protected electrical components may face corrosion and maintenance problems over time.
For this reason, we can customize the equipment according to the local environment. For projects with strong salt spray and high humidity, we can use 316 stainless steel piping for key parts of the system. We also consider equipment enclosure protection, electrical component selection, pipeline layout, drainage, ventilation, and maintenance access during the design stage.
This practical approach is important for remote island resorts. Sending technicians or spare parts to an island can take more time than doing the same work at a mainland hotel. We therefore try to make the equipment easier to inspect, operate, and maintain from the beginning.
For overseas hotel projects, we can equip the system with a PLC + HMI control system. Operators can check key operating information from the control interface and manage the main equipment according to the configured operating program.
A remote Wi-Fi monitoring option can also be included where the project conditions allow it. This gives the hotel management team a convenient way to check equipment status without standing beside the machine.
For remote projects, this can make routine management much easier. If an abnormal operating condition occurs, the operating information can also help the maintenance team understand the situation before arranging an on-site inspection.
Some island resorts are located far away from a stable municipal power grid. In these cases, we can design a solar photovoltaic power package together with the desalination system.
The exact solar capacity depends on the desalination capacity, operating hours, local sunlight conditions, battery requirements, and other electrical loads. We do not recommend using one fixed solar specification for every island. Instead, we calculate the power requirement according to the actual project.
This configuration is particularly useful for remote islands, small offshore facilities, eco-resorts, and coastal sites where extending the public power network is difficult or expensive.
Seawater desalination provides the main freshwater source, but we also look at how water can be used more efficiently after it reaches the resort.
For suitable non-drinking applications, we can design a simple water reuse system for selected wastewater sources. For example, properly treated water from showers or swimming pool-related drainage may be considered for landscape irrigation, depending on local regulations and the actual water quality.
We always separate drinking water from reclaimed water applications. Reclaimed water should not be used for drinking or other applications unless it has been treated to the required standard and approved for that purpose by the relevant local authority.
| Water Source | Possible Treatment | Potential Application |
|---|---|---|
| Seawater | Pretreatment + SWRO | Hotel freshwater supply |
| Purified water | Advanced purification | Drinking water |
| Suitable shower wastewater | Filtration and appropriate reuse treatment | Landscape irrigation |
| Suitable pool-related drainage | Filtration and water quality adjustment | Non-potable applications |
Source: Qingdao Yanhui Environmental Protection Technology Co., Ltd. engineering application reference. Actual reuse applications should be confirmed according to local water quality requirements and project regulations.
We manufacture water treatment equipment as an engineering product, not simply as a collection of pumps, filters, pipes, and electrical cabinets. Before production begins, we first confirm the project requirements and process design.
We collect information about the raw water source, seawater quality, required freshwater capacity, installation location, available power supply, operating hours, and intended water use.
For an island resort, we also pay attention to factors such as seawater temperature, salinity, site space, transportation conditions, and local maintenance capabilities. These details can affect the final equipment configuration.
After the basic project information is confirmed, our engineering team develops the treatment process and selects suitable equipment. The design may include seawater intake, pretreatment, high-pressure pumping, RO membranes, energy-related components, post-treatment, control systems, storage tanks, and distribution equipment.
The production capacity, number of operating units, materials, automation level, and electrical configuration are adjusted according to the project.
After the technical configuration is confirmed, we begin equipment manufacturing and assembly. Pipes, pumps, filters, membranes, valves, instruments, electrical components, and control systems are installed according to the approved design.
For containerized systems, the major components can be integrated inside the container to create a compact and transportable water treatment unit. This helps reduce the amount of installation work required at the resort site.
Before shipment, we carry out equipment assembly checks, electrical checks, pipeline inspections, and system commissioning according to the project requirements.
We check whether pumps, valves, instruments, control components, and other major parts work correctly. The exact factory testing procedure depends on the equipment type and contract requirements.
Before delivery, we prepare the technical documents and operating information required for the project. Depending on the contract, documentation may include equipment specifications, operating instructions, electrical information, process drawings, maintenance information, and other technical files.
The production period depends on the project size and configuration. Standard equipment normally has a shorter delivery period, while customized seawater desalination projects require additional time for process design, component selection, manufacturing, assembly, and testing.
The following table summarizes the reference configuration for a large coastal resort estate with 100–260 guest rooms. These figures are used for project planning and can be adjusted after we receive the customer's actual water demand and site information.
| System | Reference Configuration | Purpose |
|---|---|---|
| Daily water demand | 120–220 m³/day | Overall resort water planning |
| SWRO desalination | 130 m³/day, approximately 5.4 m³/h | Freshwater production |
| Container configuration | Two 40-ft containers in parallel | Modular installation and operational flexibility |
| Main pre-filter | 15 m³/h, DN65 | Initial filtration |
| Multimedia pretreatment | 12 m³/h | Further pretreatment |
| Central purification | 8 m³/h, dual-tank parallel | Central water purification |
| Central softening | 8 m³/h, three-tank parallel | Continuous softened water supply |
| Purified drinking water | 2 m³/h | Central drinking water production |
Source: Qingdao Yanhui Environmental Protection Technology Co., Ltd. project reference configuration supplied for this resort application. Final specifications are subject to site survey, raw water analysis, process design, and contract confirmation.
Our Large-Scale Coastal Resort Water Treatment solution is not limited to one type of hotel. The same basic engineering concept can be adjusted for different coastal and island projects.
Island resorts often have limited freshwater resources and face high transportation costs for bottled or bulk water. A seawater desalination system can provide a local freshwater source and reduce dependence on water transported from the mainland.
Hotels located near the sea can use seawater as a raw water source when local conditions and regulations permit. Our equipment can be designed to supply water for guest rooms, restaurants, laundry, cleaning, and other hotel operations.
Compact containerized desalination equipment is also suitable for offshore platforms, barges, marine facilities, and other locations where installation space is limited.
Depending on the water quality requirements, desalination and purification equipment can also be used in selected fisheries and aquaculture-related applications.
Our engineering team can also customize seawater desalination systems for industrial production and municipal water supply projects. The treatment process is selected according to raw water quality and the required final water quality rather than using the same design for every customer.
At Qingdao Yanhui Environmental Protection Technology Co., Ltd., we have been working in water treatment since 2015. Our work covers seawater desalination, high-salinity wastewater treatment, concentration and purification, and industrial wastewater treatment.
We provide services across the complete project process, including R&D, process design, equipment manufacturing, installation, commissioning, operation, and maintenance.
For us, customization is not simply changing the size of a tank or adding another pump. A proper water treatment system needs to match the raw water, required output, installation environment, electrical conditions, operating schedule, and maintenance plan.
For example, an island resort may need corrosion-resistant materials because of salt spray. Another project may need a containerized design because there is not enough construction space. A remote site may require solar power and remote monitoring. A hotel with a high drinking water demand may need a separate centralized purification system.
These are different engineering problems, so we design the equipment accordingly.
Customized seawater desalination system design
Containerized and skid-mounted equipment options
Complete pretreatment and post-treatment solutions
Corrosion-resistant material options for coastal environments
PLC and HMI automated control systems
Optional remote monitoring for overseas projects
Factory assembly and equipment testing before shipment
Technical documents and operating instructions
Installation and commissioning support
Operation and maintenance support
For international projects, equipment delivery is part of the engineering process. A desalination system may contain pumps, membranes, pressure vessels, electrical cabinets, stainless steel piping, instruments, valves, and other components. Proper packaging is therefore important.
Depending on equipment dimensions and transportation requirements, we can use wooden cases, pallets, or containers for reinforcement and protection. The final packaging method is selected according to the equipment structure and shipping conditions.
For overseas resort projects, transportation may involve road freight, sea freight, or multimodal transportation. Containerized desalination equipment can be prepared according to the agreed shipping method and project requirements.
Before shipment, we check the equipment condition and arrange the necessary technical documents. Our aim is to make the installation process at the customer's site more straightforward and reduce avoidable problems during commissioning.
The reference configuration provides approximately 130 m³/day (5.4 m³/h) of desalinated water using two containerized SWRO units operating in parallel. The final production capacity can be adjusted according to the resort's actual daily water consumption, peak demand, seawater conditions, and operating schedule.
Two units provide more operational flexibility. If one unit needs maintenance, the other unit can continue operating. This can be useful for large resorts where a complete shutdown of freshwater production would create operational problems.
Yes. We can select corrosion-resistant materials and customize key piping and components according to the local environment. For high-salt-spray island projects, 316 stainless steel piping can be considered for suitable sections of the system.
Yes. Containerized SWRO systems are one of our options for island resorts, offshore facilities, and remote coastal locations. The container format integrates major equipment into a transportable unit and can simplify site installation.
Yes. We can evaluate an off-grid solar power configuration for remote island projects. The required photovoltaic capacity, energy storage, and electrical system should be calculated according to the desalination capacity, local solar conditions, operating hours, and other project loads.
The production period depends on the equipment configuration and project size. Standard systems generally have a shorter production period. Customized projects require additional time for water analysis, process design, component selection, manufacturing, assembly, and factory testing. We confirm the delivery schedule after the technical configuration is finalized.
We normally need information such as raw water source, water quality analysis, required daily water production, peak water demand, power supply, installation location, available space, intended water use, local environmental conditions, and transportation requirements. These details allow us to prepare a more practical proposal.
Yes. Our integrated engineering service covers equipment manufacturing, installation, commissioning, operation, and maintenance support. The exact service scope is confirmed according to the project contract and site conditions.
Yes, a separate centralized purified water station can be configured. For the reference resort project, the drinking water system has a capacity of approximately 2 m³/h, with purified water distributed through the hotel's internal water network. Final drinking water treatment should be designed according to local drinking water standards and the actual raw water quality.
Routine maintenance normally includes checking pumps, valves, instruments, filters, electrical components, membrane operating conditions, and other key parts. Pretreatment performance is especially important because effective pretreatment helps protect RO membranes and maintain stable system operation. We provide operating and maintenance information with the equipment according to the project requirements.
A large island resort needs more than a desalination machine. It needs a complete water supply plan that can work day after day, through busy seasons, changing weather, and the special conditions of a coastal environment.
Our Large-scale coastal resort estate water treatment solution combines containerized SWRO seawater desalination, pretreatment, central water purification, water softening, and purified drinking water treatment. Optional corrosion protection, remote monitoring, solar power, and water reuse systems can be added according to project requirements.
We design each project around the actual site rather than simply offering a standard equipment list. From the first water analysis and process design to manufacturing, factory testing, transportation, installation, commissioning, and after-sales support, our team can work with customers throughout the project.
If you are planning a 100–260 room island resort, coastal hotel, beach resort, or integrated marine tourism project, we can develop a customized seawater desalination system for your hotel based on your water demand, seawater quality, available space, power supply, and operating conditions.
Qingdao Yanhui Environmental Protection Technology Co., Ltd. provides customized seawater desalination equipment and integrated water treatment engineering services for coastal, island, marine, industrial, and municipal applications.
Contact us with your basic project information, including the number of guest rooms, estimated daily water consumption, seawater analysis, installation location, and preferred delivery schedule. We can then evaluate the required treatment capacity and prepare a suitable technical solution.
This website uses cookies to ensure you get the best experience on our website.